EBV– Primary school in Parc Extension
Our team converted and retrofitted the mechanical room of a primary school using high efficiency, natural gas-powered boilers. The equipment installed includes:
- 4x High Efficiency CleaverBrooks boilers with 4000 MBH load capacity each.
- 15 Taco pumps.
- 1 Ingenia ventilation unit.
MIURA Steam – High Pressure Steam Boiler installation
Three Muira high pressure steam boilers were used to modernize this building’s mechanical room.
CDSM – High Efficiency Boiler Room Modernization
State of the art Viessmann boilers are used in this modernized boiler room. The gas-powered boilers work in tandem with electric water heaters to provide an eco-friendly solution to the heating needs of the building.